Atlas Roofing

Completed 2022

Designed to ensure the existing manufacturing facility remained enclosed and operational during construction, here are some of the highlights of things that were highlights of this design.

  • Building Structure designed to bear on curbs to eliminate damage due to forklift traffic

  • Ventilation Louvers installed to match existing facility

  • Building structure layout designed to match existing, optimizing interior column placement

  • 31,200 SF addition to existing 108,000 SF facility

Coming Soon
td1.JPG

TWIN DISC

Completed 2020

Our flagship industrial project, Twin Disc struck a mutual partnership with the City of Lufkin, building a new Assembly & Warehouse Facility. Here are some project highlights, oh, and don't forget to click on the video link for an in depth look through the construction process. 

Warehouse: 31,684 Sq. Ft.

Employee Center: 2991 Sq. Ft.

Administration: 2355 Sq. Ft.

  • New Production Warehouse Facility

  • Loading Docks

  • Shipping Area

  • Employee Center

  • High Bay Assembly Center

  • Low Bay Assembly Center

  • Provisions for future bridge cranes

Final 3.jpg

Darling Ingredients

Completed 2019

Located in Grapeland, Texas, Darling's new plant presented GLS with a unique opportunity to expand our structural knowledge and industrial scope. Here are some of the highlights:

  • Pre-cast Tilt Wall & Pre-Cast Double-Tee Roof System Construction Process Building

  • 10,750 Cubic Yard of Heavy Duty Paving

  • Process Building

  • Truck Shop/Wash Bay

  • Maintenance Shop

  • Administration/Lab/Showers & Breakroom

  • Extensive use of Trench Drains and Embedded Steal

  • Multiple Heavy Equipment Foundations

At the request of our client, pictures will not be displayed of this project for proprietary purposes.

IMG_3198.JPG

National Equipment Corporation

Administration and Warehouse

  • 8,500 sq. ft. Total (8450 sq. ft Office & 20,050 sq. ft. Warehouse space)

  • Office, production, and warehouse facility

  • 2-Large specialty 3D printer rooms with separate filtration system, large shop area for processing the cut products, large warehouse area for storing finished products and raw materials

  • Large conference area for meetings, 4 private offices, waiting and reception area, cubical area, break area with restrooms for office workers, break area with restrooms for shop/ warehouse employees

  • Loading dock area for sending and receiving shipments

DSC_0878.jpg

Dolphin Services & Chemicals Office Building

Building Area:

Office - 4,576 sq. ft.

Shop - 15,000 sq. ft.

Project Highlights:

  • 9 Offices

  • Conference/Training Room

  • Wash Bay

  • Bridge Crane

  • Lab

  • Drive Thru Service Bays

  • Loading Dock

Some of our other project galleries:

Some of our industrial clients:

  • American Color Graphics

  • Cleco Energy

  • REC Industries

  • PID Services

  • Lincoln Lumber Co

  • Conoco Phillips

  • Texas Timberjack, Inc.

  • Lockheed Martin Corp.

  • Georgia Pacific

  • American eChem, Inc.

  • Baker Hughes / GE

  • Tyson's

  • Hammer Equipment

  • Atlas Corporation

  • Nucor Vulcraft

  • East Texas Asphalt

IMG_20150724_065742671.jpg
bottom of page